Eliwana was designed differently from day one.
Commissioned in 2020, its advanced low-profile plant can direct load up to 5,200 tonnes of ore per hour. Faster movement. Lower energy use. Long-term operational efficiency built into the system from the start.
Located in Nanutarra in Western Australia’s Pilbara region, on Puutu Kunti Kurrama and Pinikura Country, Eliwana is now helping lead the next shift in heavy industry.
Built for performance. Built for what comes next.
Eliwana is one of the first sites in our network being designed around renewable energy systems at scale.
Battery storage and transmission infrastructure are reshaping how heavy industry gets powered.
This isn’t theory. It’s energy infrastructure built to keep real operations moving.
JSS component is missing React implementation. See the developer console for more information.
Follow the projects, progress and breakthroughs driving Real Zero across our Pilbara operations.

19 August 2026

28 July 2026

23 July 2026

14 July 2026

30 June 2026

29 June 2026

23 June 2026
.jpg%3Fh%3D2962%26iar%3D0%26w%3D5272&w=3840&q=75)
22 June 2026

16 June 2026

12 June 2026