Charging at scale
Electrification only works if the fleet can charge inside the rhythm of real operations.
We’re deploying 6MW fast chargers capable of recharging our 240-tonne haul trucks in under 30 minutes - aligned to the operating cycles of our fleet.
Built for continuous, high-demand operations.
Because if it can’t charge at scale, it can’t work at scale.


Built into the system
Our electric assets don’t operate in isolation.
They’re powered by the Green Grid, coordinated through our technology ecosystem and supported by the people building the transition on the ground.
As operations change, so do the skills needed to run them - from electrical capability to maintaining electrified equipment across our sites.
This is how Real Zero scales: power, technology, machines and people working as one system.